PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/16 00:00 0.00 ---- 17.90 15737 12.34
06/16 01:00 0.00 ---- 17.84 15640 12.30
06/16 02:00 0.00 ---- 17.77 15527 12.28
06/16 03:00 0.00 ---- 17.72 15446 12.26
06/16 04:00 0.00 ---- 17.66 15349 12.23
06/16 05:00 0.00 ---- 17.54 15156 12.24
06/16 06:00 0.00 ---- 17.49 15075 12.23
06/16 07:00 0.00 ---- 17.38 14898 12.21
06/16 08:00 0.00 ---- 17.33 14818 12.27
06/16 09:00 0.00 ---- 17.22 14641 12.37
06/16 10:00 0.00 ---- 17.08 14417 12.53
06/16 11:00 0.00 ---- 17.02 14320 12.91
06/16 12:00 0.00 ---- 16.91 14144 12.79
06/16 13:00 0.00 ---- 16.83 14016 13.03
06/16 14:00 0.00 ---- 16.74 13873 13.07
06/16 15:00 0.00 ---- 16.67 13761 12.76
06/16 16:00 0.00 ---- 16.60 13650 12.86
06/16 17:00 0.00 ---- 16.58 13618 12.96
06/16 18:00 0.00 ---- 16.54 13554 12.80
06/16 19:00 0.00 ---- 16.54 13554 12.61
06/16 20:00 0.00 ---- 16.52 13522 12.58
06/16 21:00 0.00 ---- 16.49 13474 12.54
06/16 22:00 0.00 ---- 16.46 13427 12.52
06/16 23:00 0.00 ---- 16.47 13443 12.48
Data processed at Tue 17Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.