PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/15 00:00 0.00 ---- 16.16 12950 12.31
06/15 01:00 0.00 ---- 16.21 13030 11.55
06/15 02:00 0.02 ---- 16.27 13125 12.29
06/15 03:00 0.14 ---- 16.36 13268 12.28
06/15 04:00 0.19 ---- 16.54 13554 12.27
06/15 05:00 0.18 ---- 16.68 13777 12.27
06/15 06:00 0.03 ---- 16.82 14000 12.25
06/15 07:00 0.01 ---- 16.98 14256 12.27
06/15 08:00 0.21 ---- 17.12 14481 12.27
06/15 09:00 0.08 ---- 17.26 14705 12.28
06/15 10:00 0.03 ---- 17.38 14898 12.34
06/15 11:00 0.01 ---- 17.50 15091 12.59
06/15 12:00 0.00 ---- 17.58 15220 12.37
06/15 13:00 0.00 ---- 17.67 15365 12.33
06/15 14:00 0.00 ---- 17.76 15510 12.80
06/15 15:00 0.00 ---- 17.83 15623 12.73
06/15 16:00 0.00 ---- 17.89 15720 12.99
06/15 17:00 0.00 ---- 17.87 15688 12.80
06/15 18:00 0.00 ---- 17.89 15720 11.86
06/15 19:00 0.00 ---- 17.90 15737 12.60
06/15 20:00 0.00 ---- 17.90 15737 12.53
06/15 21:00 0.00 ---- 17.94 15801 12.46
06/15 22:00 0.00 ---- 17.92 15769 12.44
06/15 23:00 0.00 ---- 17.95 15818 12.40
Data processed at Mon 16Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.