PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/17 00:00 0.00 ---- 16.08 12824 12.46
06/17 01:00 0.00 ---- 16.04 12760 12.44
06/17 02:00 0.00 ---- 16.02 12729 12.41
06/17 03:00 0.00 ---- 15.95 12618 12.40
06/17 04:00 0.00 ---- 15.92 12571 12.40
06/17 05:00 0.00 ---- 15.91 12555 12.38
06/17 06:00 0.00 ---- 15.88 12507 12.35
06/17 07:00 0.00 ---- 15.85 12460 12.36
06/17 08:00 0.00 ---- 15.85 12460 12.34
06/17 09:00 0.00 ---- 15.82 12413 12.34
06/17 10:00 0.05 ---- 15.82 12413 12.32
06/17 11:00 0.02 ---- 15.78 12350 12.34
06/17 12:00 0.01 ---- 15.78 12350 12.35
06/17 13:00 0.01 ---- 15.77 12334 12.33
06/17 14:00 0.00 ---- 15.76 12318 12.80
06/17 15:00 0.00 ---- 15.73 12271 12.62
06/17 16:00 0.00 ---- 15.78 12350 12.88
06/17 17:00 0.00 ---- 15.76 12318 12.83
06/17 18:00 0.00 ---- 15.75 12302 12.67
06/17 19:00 0.00 ---- 15.73 12271 12.57
06/17 20:00 0.00 ---- 15.75 12302 12.49
06/17 21:00 0.00 ---- 15.78 12350 12.44
06/17 22:00 0.00 ---- 15.75 12302 12.38
06/17 23:00 0.00 ---- 15.76 12318 12.36
Data processed at Wed 18Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.