PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/07 00:00 0.00 ---- 24.66 27075 12.40
06/07 01:00 0.00 ---- 24.50 26756 12.37
06/07 02:00 0.00 ---- 24.39 26564 12.36
06/07 03:00 0.00 ---- 24.18 26197 12.34
06/07 04:00 0.01 ---- 23.91 25730 12.33
06/07 05:00 0.26 ---- 23.61 25220 12.30
06/07 06:00 0.03 ---- 23.27 24643 12.30
06/07 07:00 0.15 ---- 22.84 23915 12.27
06/07 08:00 0.00 ---- 22.49 23324 12.27
06/07 09:00 0.00 ---- 22.11 22685 12.49
06/07 10:00 0.00 ---- 21.73 22047 12.73
06/07 11:00 0.00 ---- 21.37 21445 12.62
06/07 12:00 0.00 ---- 21.10 20994 12.87
06/07 13:00 0.00 ---- 20.85 20578 13.06
06/07 14:00 0.00 ---- 20.66 20262 12.99
06/07 15:00 0.00 ---- 20.45 19914 12.86
06/07 16:00 0.00 ---- 20.30 19665 13.09
06/07 17:00 0.00 ---- 20.27 19616 12.81
06/07 18:00 0.00 ---- 20.22 19533 12.80
06/07 19:00 0.00 ---- 20.13 19384 12.61
06/07 20:00 0.00 ---- 20.09 19318 12.57
06/07 21:00 0.00 ---- 20.11 19351 12.54
06/07 22:00 0.00 ---- 20.05 19252 12.50
06/07 23:00 0.00 ---- 20.02 19202 12.47
Data processed at Sun 08Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.