PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/06 00:00 0.00 ---- 24.78 29101 12.30
06/06 01:00 0.00 ---- 24.79 29132 12.27
06/06 02:00 0.00 ---- 24.81 29194 12.27
06/06 03:00 0.04 ---- 24.82 29225 12.27
06/06 04:00 0.14 ---- 24.82 29225 12.26
06/06 05:00 0.13 ---- 24.86 29349 12.25
06/06 06:00 0.14 ---- 24.86 29349 12.24
06/06 07:00 0.14 ---- 24.98 29722 12.24
06/06 08:00 0.01 ---- 24.94 29598 12.23
06/06 09:00 0.00 ---- 24.93 29566 12.31
06/06 10:00 0.00 ---- 25.02 29848 12.24
06/06 11:00 0.00 ---- 24.97 29691 12.27
06/06 12:00 0.00 ---- 25.04 29911 12.96
06/06 13:00 0.00 ---- 25.05 29942 12.73
06/06 14:00 0.00 ---- 25.06 29973 12.86
06/06 15:00 0.00 ---- 25.07 30005 12.86
06/06 16:00 0.00 ---- 25.05 29942 12.96
06/06 17:00 0.00 ---- 25.04 29911 12.73
06/06 18:00 0.00 ---- 25.02 29848 12.64
06/06 19:00 0.00 ---- 25.03 29879 12.57
06/06 20:00 0.00 ---- 25.04 29911 12.51
06/06 21:00 0.00 ---- 25.02 29848 12.50
06/06 22:00 0.00 ---- 25.02 29848 12.46
06/06 23:00 0.00 ---- 25.03 29879 12.41
Data processed at Sat 07Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.