PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/05 00:00 0.00 ---- 24.02 25918 12.34
06/05 01:00 0.00 ---- 24.12 26093 12.31
06/05 02:00 0.00 ---- 24.19 26215 12.31
06/05 03:00 0.00 ---- 24.18 26197 12.27
06/05 04:00 0.00 ---- 24.21 26250 12.29
06/05 05:00 0.00 ---- 24.29 26389 12.30
06/05 06:00 0.00 ---- 24.34 26476 12.28
06/05 07:00 0.00 ---- 24.30 26407 12.27
06/05 08:00 0.00 ---- 24.39 26564 12.29
06/05 09:00 0.00 ---- 24.40 26581 12.31
06/05 10:00 0.00 ---- 24.46 26686 12.30
06/05 11:00 0.00 ---- 24.45 26668 12.31
06/05 12:00 0.00 ---- 24.51 26773 12.50
06/05 13:00 0.00 ---- 24.54 26826 12.50
06/05 14:00 0.00 ---- 24.53 26808 12.67
06/05 15:00 0.00 ---- 24.55 26843 12.59
06/05 16:00 0.00 ---- 24.51 26773 12.75
06/05 17:00 0.00 ---- 24.60 26931 12.77
06/05 18:00 0.00 ---- 24.57 26878 12.69
06/05 19:00 0.00 ---- 24.57 26878 12.59
06/05 20:00 0.00 ---- 24.62 26966 12.52
06/05 21:00 0.00 ---- 24.56 26861 12.43
06/05 22:00 0.00 ---- 24.58 26896 12.40
06/05 23:00 0.00 ---- 24.60 26931 12.34
Data processed at Fri 06Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.