PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/04 00:00 0.41 ---- 16.37 13284 12.44
06/04 01:00 0.00 ---- 17.29 14753 12.42
06/04 02:00 0.00 ---- 18.21 16239 12.40
06/04 03:00 0.00 ---- 18.91 17379 12.37
06/04 04:00 0.00 ---- 19.45 18264 12.36
06/04 05:00 0.00 ---- 20.10 19334 12.34
06/04 06:00 0.00 ---- 20.56 20096 12.33
06/04 07:00 0.00 ---- 21.09 20978 12.31
06/04 08:00 0.00 ---- 21.46 21595 12.33
06/04 09:00 0.00 ---- 21.83 22215 12.33
06/04 10:00 0.00 ---- 22.15 22752 12.36
06/04 11:00 0.00 ---- 22.39 23156 12.35
06/04 12:00 0.00 ---- 22.63 23560 12.63
06/04 13:00 0.00 ---- 22.79 23830 12.86
06/04 14:00 0.00 ---- 23.04 24253 12.85
06/04 15:00 0.00 ---- 23.11 24372 12.77
06/04 16:00 0.00 ---- 23.32 24727 12.82
06/04 17:00 0.00 ---- 23.35 24778 12.66
06/04 18:00 0.00 ---- 23.42 24897 12.77
06/04 19:00 0.00 ---- 23.39 24846 12.59
06/04 20:00 0.00 ---- 23.45 24948 12.48
06/04 21:00 0.00 ---- 23.49 25016 12.41
06/04 22:00 0.00 ---- 23.55 25118 12.36
06/04 23:00 0.00 ---- 23.58 25169 12.34
Data processed at Thu 05Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.