PPFK1: Grand River, Parsons, KS

                                SHEF ID:       PPFK1     NEOSHO RIVER NEAR PARSONS 8E
STATION TYPE:
Regulating: Stage = 19.00, Flow = 17526

PRECIP ELEVATION STAGE RIV-FLOW BAT-LOAD
in ft ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/08 00:00 0.00 ---- 18.90 17362 12.44
06/08 01:00 0.00 ---- 18.66 16971 12.43
06/08 02:00 0.00 ---- 18.48 16678 12.40
06/08 03:00 0.00 ---- 18.21 16239 12.37
06/08 04:00 0.00 ---- 17.98 15866 12.39
06/08 05:00 0.00 ---- 17.80 15575 12.37
06/08 06:00 0.00 ---- 17.62 15285 12.36
06/08 07:00 0.00 ---- 17.43 14979 12.34
06/08 08:00 0.00 ---- 17.25 14689 12.36
06/08 09:00 0.00 ---- 17.15 14529 12.60
06/08 10:00 0.00 ---- 17.04 14352 12.88
06/08 11:00 0.00 ---- 16.93 14176 12.17
06/08 12:00 0.00 ---- 16.86 14064 13.11
06/08 13:00 0.00 ---- 16.84 14032 13.28
06/08 14:00 0.00 ---- 16.82 14000 13.42
06/08 15:00 0.00 ---- 16.77 13921 13.17
06/08 16:00 0.00 ---- 16.79 13953 12.79
06/08 17:00 0.00 ---- 16.82 14000 12.63
06/08 18:00 0.00 ---- 16.82 14000 12.63
06/08 19:00 0.00 ---- 16.81 13985 12.56
06/08 20:00 0.00 ---- 16.79 13953 12.53
06/08 21:00 0.00 ---- 16.81 13985 12.51
06/08 22:00 0.00 ---- 16.82 14000 11.66
06/08 23:00 0.01 ---- 16.84 14032 12.44
Data processed at Mon 09Jun2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
PARS.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
PARS.Elev.Inst.1Hour.0.Ccp-Rev
PARS.Stage.Inst.1Hour.0.Ccp-Rev
PARS.Flow.Inst.1Hour.0.Ccp-Rev
PARS.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.