EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/10 00:00 0.00 1.41 338 79.09 12.89
08/10 01:00 0.00 1.39 331 78.98 12.81
08/10 02:00 0.00 1.36 320 78.82 12.81
08/10 03:00 0.00 1.33 310 78.48 12.81
08/10 04:00 0.00 1.29 297 78.06 12.73
08/10 05:00 0.00 1.26 287 77.86 12.73
08/10 06:00 0.00 1.23 278 77.72 12.73
08/10 07:00 0.00 1.19 265 77.61 12.73
08/10 08:00 0.00 1.17 259 77.58 12.81
08/10 09:00 0.00 1.13 247 77.58 13.13
08/10 10:00 0.00 1.12 244 77.70 13.37
08/10 11:00 0.00 1.10 238 78.06 13.53
08/10 12:00 0.00 1.04 221 78.66 13.44
08/10 13:00 0.00 1.03 218 79.41 13.37
08/10 14:00 0.00 1.01 213 79.99 13.13
08/10 15:00 0.00 0.99 207 80.44 13.05
08/10 16:00 0.00 0.97 202 80.96 12.97
08/10 17:00 0.00 0.96 200 80.98 13.05
08/10 18:00 0.00 0.95 197 81.01 12.97
08/10 19:00 0.00 0.93 193 80.98 12.97
08/10 20:00 0.00 0.91 188 80.83 12.97
08/10 21:00 0.00 0.91 188 80.69 12.89
08/10 22:00 0.00 0.89 182 80.55 12.89
08/10 23:00 0.00 0.88 180 80.42 12.89
Data processed at Sun 11Aug2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.