BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/10 00:00 389.15 292 13.19 12.53
08/10 01:00 389.07 276 13.21 12.54
08/10 02:00 388.99 261 13.22 12.54
08/10 03:00 388.93 250 13.20 12.54
08/10 04:00 388.85 237 13.21 12.54
08/10 05:00 388.80 229 13.20 12.54
08/10 06:00 388.75 221 13.20 12.54
08/10 07:00 388.70 213 13.19 12.54
08/10 08:00 388.65 206 13.21 12.54
08/10 09:00 388.61 200 13.22 12.53
08/10 10:00 388.57 195 13.19 12.53
08/10 11:00 388.54 190 13.19 12.53
08/10 12:00 388.51 187 13.05 12.50
08/10 13:00 388.47 181 13.04 12.50
08/10 14:00 388.45 179 13.19 12.50
08/10 15:00 388.42 175 13.20 12.50
08/10 16:00 388.39 171 13.21 12.50
08/10 17:00 388.36 168 13.19 12.50
08/10 18:00 388.35 167 13.19 12.50
08/10 19:00 388.32 163 13.21 12.53
08/10 20:00 388.30 161 13.19 12.53
08/10 21:00 388.28 159 13.20 12.53
08/10 22:00 388.27 158 13.20 12.53
08/10 23:00 ---- ---- ---- ----
Data processed at Sun 11Aug2024 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.