EAGO2: Mountain Fork Riv, Eagletown,

                                SHEF ID:       EAGO2     Mountain Fork near Eagletown, OK
STATION TYPE: Stream Gauge
Regulating: Stage = 9.00, Flow = 9433

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/09 00:00 0.00 1.28 294 77.94 12.81
08/09 01:00 0.00 1.25 284 77.79 12.81
08/09 02:00 0.00 1.21 271 77.65 12.81
08/09 03:00 0.00 1.18 262 77.43 12.73
08/09 04:00 0.00 1.16 256 77.20 12.73
08/09 05:00 0.00 1.13 247 76.91 12.73
08/09 06:00 0.00 1.11 241 76.66 12.73
08/09 07:00 0.00 1.08 232 76.44 12.73
08/09 08:00 0.00 1.06 226 76.24 12.81
08/09 09:00 0.00 1.04 221 76.24 13.21
08/09 10:00 0.00 1.03 218 76.41 13.37
08/09 11:00 0.00 1.02 215 76.77 13.44
08/09 12:00 0.00 1.00 210 77.43 13.37
08/09 13:00 0.00 0.98 205 77.97 13.29
08/09 14:00 0.00 0.96 200 78.10 13.05
08/09 15:00 0.00 0.95 197 78.44 13.05
08/09 16:00 0.00 0.93 193 79.03 13.05
08/09 17:00 0.00 0.92 191 79.30 12.97
08/09 18:00 0.00 0.90 185 79.27 13.05
08/09 19:00 0.00 0.90 185 79.21 13.05
08/09 20:00 0.00 0.98 205 79.12 12.97
08/09 21:00 0.00 1.17 259 78.93 12.97
08/09 22:00 0.00 1.31 303 78.89 12.89
08/09 23:00 0.00 1.39 331 79.03 12.89
Data processed at Sat 10Aug2024 04:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
EAGL.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
EAGL.Stage.Inst.1Hour.0.Ccp-Rev
EAGL.Flow.Inst.1Hour.0.Ccp-Rev
EAGL.Temp-Water.Inst.1Hour.0.Ccp-Rev
EAGL.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.