CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/10 00:00 0.00 13.35 6306 12.73 12.45
09/10 01:00 0.00 13.36 6322 12.72 12.44
09/10 02:00 0.00 13.34 6290 12.73 12.44
09/10 03:00 0.00 13.34 6290 12.71 12.44
09/10 04:00 0.00 13.33 6273 12.73 12.44
09/10 05:00 0.00 13.32 6257 12.72 12.44
09/10 06:00 0.00 13.33 6273 12.72 12.44
09/10 07:00 0.00 13.30 6225 12.71 12.44
09/10 08:00 0.00 13.30 6225 12.72 12.44
09/10 09:00 0.00 13.29 6208 12.80 12.48
09/10 10:00 0.00 13.28 6192 12.78 12.54
09/10 11:00 0.00 13.26 6160 12.77 12.50
09/10 12:00 0.00 13.26 6160 12.76 12.46
09/10 13:00 0.00 13.26 6160 12.73 12.44
09/10 14:00 0.00 13.25 6144 12.73 12.44
09/10 15:00 0.00 13.24 6128 12.73 12.44
09/10 16:00 0.00 13.23 6112 12.73 12.44
09/10 17:00 0.00 13.24 6128 12.73 12.45
09/10 18:00 0.00 13.21 6080 12.73 12.44
09/10 19:00 0.00 13.21 6080 12.73 12.44
09/10 20:00 0.00 13.21 6080 12.73 12.44
09/10 21:00 0.00 13.19 6048 12.73 12.44
09/10 22:00 0.00 13.18 6032 12.73 12.44
09/10 23:00 0.00 13.18 6032 12.73 12.44
Data processed at Thu 11Sep2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.