CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/09 00:00 0.00 13.49 6537 12.73 12.44
09/09 01:00 0.00 13.48 6521 12.73 12.44
09/09 02:00 0.00 13.48 6521 12.73 12.44
09/09 03:00 0.00 13.47 6505 12.73 12.44
09/09 04:00 0.00 13.48 6521 12.73 12.44
09/09 05:00 0.00 13.47 6505 12.73 12.44
09/09 06:00 0.00 13.45 6471 12.71 12.44
09/09 07:00 0.00 13.45 6471 12.73 12.43
09/09 08:00 0.00 13.46 6488 12.72 12.44
09/09 09:00 0.00 13.45 6471 12.73 12.43
09/09 10:00 0.00 13.42 6421 12.73 12.44
09/09 11:00 0.00 13.42 6421 12.73 12.44
09/09 12:00 0.00 13.44 6455 12.73 12.44
09/09 13:00 0.00 13.41 6405 12.73 12.43
09/09 14:00 0.00 13.41 6405 12.73 12.44
09/09 15:00 0.00 13.43 6438 12.73 12.43
09/09 16:00 0.00 13.42 6421 12.73 12.44
09/09 17:00 0.00 13.39 6372 12.73 12.44
09/09 18:00 0.00 13.40 6388 12.73 12.44
09/09 19:00 0.00 13.39 6372 12.74 12.44
09/09 20:00 0.00 13.37 6339 12.73 12.45
09/09 21:00 0.00 13.36 6322 12.73 12.45
09/09 22:00 0.00 13.37 6339 12.73 12.45
09/09 23:00 0.00 13.35 6306 12.73 12.45
Data processed at Wed 10Sep2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.