CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/11 00:00 0.00 13.13 5953 12.72 12.44
09/11 01:00 0.00 13.06 5844 12.72 12.44
09/11 02:00 0.00 13.00 5751 12.71 12.43
09/11 03:00 0.00 12.92 5630 12.73 12.44
09/11 04:00 0.00 12.82 5480 12.72 12.44
09/11 05:00 0.00 12.71 5319 12.72 12.43
09/11 06:00 0.00 12.60 5152 12.71 12.43
09/11 07:00 0.00 12.45 4923 12.70 12.43
09/11 08:00 0.00 12.32 4731 12.71 12.43
09/11 09:00 0.00 12.18 4530 12.72 12.42
09/11 10:00 0.00 12.06 4363 12.72 12.43
09/11 11:00 0.00 11.94 4201 12.73 12.43
09/11 12:00 0.00 11.84 4066 12.71 12.42
09/11 13:00 0.00 11.74 3930 12.73 12.42
09/11 14:00 0.00 11.64 3797 12.73 12.42
09/11 15:00 0.00 11.58 3719 12.77 12.48
09/11 16:00 0.00 11.51 3630 12.84 12.51
09/11 17:00 0.00 11.45 3555 12.86 12.57
09/11 18:00 0.00 11.41 3505 12.95 12.64
09/11 19:00 0.00 11.37 3456 12.89 12.64
09/11 20:00 0.00 11.32 3395 12.86 12.60
09/11 21:00 0.00 11.30 3371 12.83 12.58
09/11 22:00 0.00 11.28 3347 12.82 12.57
09/11 23:00 0.00 11.25 3312 12.81 12.55
Data processed at Fri 12Sep2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.