CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/17 00:00 0.00 12.45 4923 12.07 11.80
07/17 01:00 0.00 12.44 4908 12.07 11.80
07/17 02:00 0.00 12.43 4893 12.06 11.80
07/17 03:00 0.00 12.41 4863 12.07 11.80
07/17 04:00 0.00 12.37 4804 12.07 11.79
07/17 05:00 0.00 12.32 4731 12.06 11.79
07/17 06:00 0.00 12.32 4731 12.06 11.79
07/17 07:00 0.00 12.28 4673 12.05 11.78
07/17 08:00 0.00 12.21 4572 12.05 11.78
07/17 09:00 0.00 12.15 4488 12.05 11.78
07/17 10:00 0.00 12.07 4377 12.04 11.78
07/17 11:00 0.00 12.00 4281 12.04 11.77
07/17 12:00 0.00 11.93 4187 12.04 11.77
07/17 13:00 0.00 11.86 4094 12.04 11.77
07/17 14:00 0.00 11.79 3998 12.04 11.77
07/17 15:00 0.00 11.72 3903 12.05 11.76
07/17 16:00 0.00 11.64 3797 12.04 11.76
07/17 17:00 0.00 11.56 3694 12.04 11.76
07/17 18:00 0.00 11.47 3580 12.04 11.76
07/17 19:00 0.00 11.41 3505 12.05 11.76
07/17 20:00 0.00 11.33 3407 12.04 11.76
07/17 21:00 0.00 11.28 3347 12.04 11.77
07/17 22:00 0.00 11.23 3288 12.04 11.77
07/17 23:00 0.00 11.16 3207 12.04 11.76
Data processed at Fri 18Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.