CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/18 00:00 0.00 11.12 3161 12.04 11.77
07/18 01:00 0.00 11.07 3104 12.04 11.76
07/18 02:00 0.00 11.04 3070 12.04 11.76
07/18 03:00 0.00 11.00 3024 12.04 11.76
07/18 04:00 0.00 10.97 2990 12.04 11.76
07/18 05:00 0.00 10.94 2957 12.04 11.76
07/18 06:00 0.00 10.92 2935 12.04 11.75
07/18 07:00 0.00 10.90 2913 12.04 11.75
07/18 08:00 0.00 10.88 2891 12.03 11.75
07/18 09:00 0.00 10.85 2858 12.03 11.75
07/18 10:00 0.00 10.84 2848 12.04 11.75
07/18 11:00 0.00 10.83 2837 12.04 11.75
07/18 12:00 0.00 10.81 2815 12.03 11.75
07/18 13:00 0.00 10.79 2794 12.04 11.75
07/18 14:00 0.00 10.77 2773 12.04 11.75
07/18 15:00 0.00 10.77 2773 12.04 11.75
07/18 16:00 0.00 10.76 2762 12.04 11.75
07/18 17:00 0.00 10.74 2741 12.04 11.76
07/18 18:00 0.00 10.72 2720 12.05 11.77
07/18 19:00 0.00 10.72 2720 12.04 11.77
07/18 20:00 0.00 10.70 2700 12.04 11.76
07/18 21:00 0.00 10.69 2689 12.05 11.77
07/18 22:00 0.00 10.69 2689 12.04 11.77
07/18 23:00 0.00 10.68 2679 12.04 11.77
Data processed at Sat 19Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.