CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/16 00:00 0.00 12.63 5198 12.08 11.81
07/16 01:00 0.00 12.61 5167 12.08 11.81
07/16 02:00 0.00 12.60 5152 12.08 11.80
07/16 03:00 0.00 12.60 5152 12.07 11.81
07/16 04:00 0.00 12.58 5121 12.06 11.81
07/16 05:00 0.00 12.57 5105 12.07 11.80
07/16 06:00 0.00 12.57 5105 12.06 11.80
07/16 07:00 0.00 12.55 5074 12.06 11.79
07/16 08:00 0.00 12.55 5074 12.07 11.79
07/16 09:00 0.00 12.53 5044 12.08 11.79
07/16 10:00 0.00 12.53 5044 12.07 11.79
07/16 11:00 0.00 12.51 5013 12.07 11.78
07/16 12:00 0.00 12.52 5029 12.07 11.79
07/16 13:00 0.00 12.51 5013 12.07 11.79
07/16 14:00 0.00 12.49 4983 12.07 11.79
07/16 15:00 0.00 12.49 4983 12.06 11.79
07/16 16:00 0.00 12.48 4968 12.07 11.79
07/16 17:00 0.00 12.48 4968 12.07 11.79
07/16 18:00 0.00 12.48 4968 12.08 11.80
07/16 19:00 0.00 12.47 4953 12.08 11.81
07/16 20:00 0.00 12.48 4968 12.07 11.81
07/16 21:00 0.00 12.46 4938 12.08 11.81
07/16 22:00 0.00 12.46 4938 12.07 11.81
07/16 23:00 0.00 12.46 4938 12.07 11.81
Data processed at Thu 17Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.