CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/15 00:00 0.00 14.25 7716 12.08 11.81
07/15 01:00 0.00 14.20 7635 12.08 11.81
07/15 02:00 0.00 14.15 7554 12.07 11.81
07/15 03:00 0.00 14.05 7393 12.07 11.81
07/15 04:00 0.00 13.96 7251 12.07 11.81
07/15 05:00 0.00 13.86 7095 12.08 11.81
07/15 06:00 0.00 13.74 6910 12.07 11.81
07/15 07:00 0.00 13.63 6744 12.07 11.79
07/15 08:00 0.00 13.51 6566 12.07 11.79
07/15 09:00 0.00 13.41 6405 12.07 11.79
07/15 10:00 0.00 13.30 6225 12.07 11.79
07/15 11:00 0.00 13.21 6080 12.07 11.79
07/15 12:00 0.00 13.12 5937 12.08 11.79
07/15 13:00 0.00 13.04 5813 12.07 11.79
07/15 14:00 0.00 12.97 5705 12.07 11.79
07/15 15:00 0.00 12.90 5599 12.08 11.80
07/15 16:00 0.00 12.85 5525 12.07 11.80
07/15 17:00 0.00 12.81 5465 12.08 11.80
07/15 18:00 0.00 12.76 5392 12.11 11.81
07/15 19:00 0.00 12.73 5348 12.10 11.82
07/15 20:00 0.00 12.70 5304 12.09 11.81
07/15 21:00 0.00 12.68 5275 12.08 11.81
07/15 22:00 0.00 12.66 5245 12.08 11.81
07/15 23:00 0.00 12.64 5214 12.08 11.81
Data processed at Wed 16Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.