CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/12 00:00 0.00 14.92 8743 12.11 11.85
07/12 01:00 0.00 14.91 8727 12.11 11.85
07/12 02:00 0.00 14.91 8727 12.11 11.83
07/12 03:00 0.00 14.92 8743 12.11 11.84
07/12 04:00 0.00 14.91 8727 12.11 11.84
07/12 05:00 0.00 14.92 8743 12.11 11.83
07/12 06:00 0.00 14.90 8711 12.11 11.83
07/12 07:00 0.00 14.91 8727 12.09 11.83
07/12 08:00 0.00 14.88 8680 12.11 11.82
07/12 09:00 0.00 14.86 8648 12.11 11.83
07/12 10:00 0.00 14.86 8648 12.11 11.83
07/12 11:00 0.00 14.84 8617 12.11 11.82
07/12 12:00 0.00 14.84 8617 12.09 11.81
07/12 13:00 0.00 14.82 8586 12.10 11.81
07/12 14:00 0.00 14.81 8570 12.11 11.81
07/12 15:00 0.00 14.79 8539 12.11 11.82
07/12 16:00 0.00 14.79 8539 12.11 11.82
07/12 17:00 0.00 14.79 8539 12.10 11.83
07/12 18:00 0.00 14.78 8524 12.11 11.83
07/12 19:00 0.00 14.83 8602 12.11 11.83
07/12 20:00 0.00 14.87 8664 12.10 11.83
07/12 21:00 0.00 14.85 8633 12.10 11.83
07/12 22:00 0.00 14.85 8633 12.10 11.83
07/12 23:00 0.00 14.85 8633 12.11 11.83
Data processed at Sun 13Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.