CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/11 00:00 0.00 15.06 8966 12.13 11.86
07/11 01:00 0.00 15.06 8966 12.13 11.87
07/11 02:00 0.00 15.06 8966 12.12 11.86
07/11 03:00 0.00 15.04 8934 12.12 11.85
07/11 04:00 0.00 15.03 8918 12.12 11.87
07/11 05:00 0.00 15.03 8918 12.12 11.85
07/11 06:00 0.00 15.02 8902 12.12 11.85
07/11 07:00 0.00 15.00 8870 12.11 11.85
07/11 08:00 0.00 15.01 8886 12.11 11.84
07/11 09:00 0.00 14.99 8854 12.11 11.85
07/11 10:00 0.00 15.00 8870 12.12 11.85
07/11 11:00 0.00 14.98 8838 12.11 11.85
07/11 12:00 0.00 14.97 8822 12.12 11.85
07/11 13:00 0.00 14.96 8806 12.11 11.85
07/11 14:00 0.00 14.96 8806 12.13 11.85
07/11 15:00 0.00 14.95 8790 12.12 11.85
07/11 16:00 0.00 14.95 8790 12.13 11.85
07/11 17:00 0.00 14.92 8743 12.13 11.85
07/11 18:00 0.00 14.94 8775 12.14 11.86
07/11 19:00 0.00 14.92 8743 12.14 11.89
07/11 20:00 0.00 14.92 8743 12.13 11.87
07/11 21:00 0.00 14.90 8711 12.12 11.86
07/11 22:00 0.00 14.91 8727 12.12 11.85
07/11 23:00 0.00 14.92 8743 12.12 11.85
Data processed at Sat 12Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.