CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/10 00:00 0.00 15.22 9225 12.14 11.88
07/10 01:00 0.00 15.21 9209 12.14 11.87
07/10 02:00 0.00 15.20 9192 12.13 11.87
07/10 03:00 0.00 15.19 9176 12.13 11.86
07/10 04:00 0.00 15.19 9176 12.13 11.85
07/10 05:00 0.00 15.19 9176 12.13 11.85
07/10 06:00 0.00 15.19 9176 12.13 11.85
07/10 07:00 0.00 15.18 9160 12.11 11.85
07/10 08:00 0.00 15.17 9144 12.11 11.85
07/10 09:00 0.00 15.16 9127 12.12 11.85
07/10 10:00 0.00 15.15 9111 12.12 11.85
07/10 11:00 0.00 15.14 9095 12.13 11.85
07/10 12:00 0.00 15.13 9079 12.13 11.85
07/10 13:00 0.00 15.13 9079 12.13 11.85
07/10 14:00 0.00 15.12 9063 12.13 11.85
07/10 15:00 0.00 15.11 9046 12.13 11.85
07/10 16:00 0.00 15.10 9030 12.13 11.85
07/10 17:00 0.00 15.11 9046 12.15 11.88
07/10 18:00 0.00 15.10 9030 12.17 11.91
07/10 19:00 0.00 15.09 9014 12.14 11.88
07/10 20:00 0.00 15.07 8982 12.14 11.88
07/10 21:00 0.00 15.08 8998 12.14 11.86
07/10 22:00 0.00 15.08 8998 12.13 11.88
07/10 23:00 0.00 15.06 8966 12.13 11.86
Data processed at Fri 11Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.