CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/09 00:00 0.00 15.35 9439 12.13 11.88
07/09 01:00 0.00 15.34 9422 12.14 11.88
07/09 02:00 0.00 15.34 9422 12.14 11.88
07/09 03:00 0.00 15.33 9406 12.14 11.87
07/09 04:00 0.00 15.34 9422 12.13 11.87
07/09 05:00 0.00 15.33 9406 12.14 11.86
07/09 06:00 0.00 15.32 9389 12.13 11.85
07/09 07:00 0.00 15.31 9373 12.13 11.85
07/09 08:00 0.00 15.31 9373 12.13 11.85
07/09 09:00 0.00 15.29 9340 12.13 11.86
07/09 10:00 0.00 15.29 9340 12.13 11.85
07/09 11:00 0.00 15.28 9323 12.13 11.85
07/09 12:00 0.00 15.26 9291 12.13 11.85
07/09 13:00 0.00 15.27 9307 12.13 11.85
07/09 14:00 0.00 15.26 9291 12.13 11.85
07/09 15:00 0.00 15.25 9274 12.14 11.85
07/09 16:00 0.00 15.26 9291 12.14 11.85
07/09 17:00 0.00 15.25 9274 12.14 11.87
07/09 18:00 0.00 15.24 9258 12.17 11.90
07/09 19:00 0.00 15.25 9274 12.14 11.88
07/09 20:00 0.00 15.22 9225 12.14 11.88
07/09 21:00 0.00 15.23 9241 12.14 11.88
07/09 22:00 0.00 15.22 9225 12.14 11.87
07/09 23:00 0.00 15.22 9225 12.14 11.88
Data processed at Thu 10Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.