CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/08 00:00 0.00 15.49 9673 12.14 11.89
07/08 01:00 0.00 15.49 9673 12.14 11.89
07/08 02:00 0.00 15.48 9656 12.15 11.88
07/08 03:00 0.00 15.47 9639 12.14 11.88
07/08 04:00 0.00 15.47 9639 12.14 11.88
07/08 05:00 0.00 15.46 9622 12.14 11.88
07/08 06:00 0.00 15.47 9639 12.13 11.88
07/08 07:00 0.00 15.44 9589 12.14 11.87
07/08 08:00 0.00 15.44 9589 12.14 11.87
07/08 09:00 0.00 15.43 9572 12.14 11.88
07/08 10:00 0.00 15.42 9555 12.14 11.88
07/08 11:00 0.00 15.41 9539 12.14 11.87
07/08 12:00 0.00 15.39 9505 12.13 11.86
07/08 13:00 0.00 15.41 9539 12.13 11.87
07/08 14:00 0.00 15.38 9489 12.14 11.87
07/08 15:00 0.00 15.38 9489 12.14 11.88
07/08 16:00 0.00 15.39 9505 12.14 11.88
07/08 17:00 0.00 15.38 9489 12.15 11.88
07/08 18:00 0.00 15.37 9472 12.14 11.88
07/08 19:00 0.00 15.38 9489 12.15 11.88
07/08 20:00 0.00 15.38 9489 12.14 11.88
07/08 21:00 0.00 15.35 9439 12.14 11.88
07/08 22:00 0.00 15.37 9472 12.15 11.88
07/08 23:00 0.00 15.36 9456 12.14 11.88
Data processed at Wed 09Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.