CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
07/13 00:00 0.00 14.86 8648 12.10 11.82
07/13 01:00 0.00 14.82 8586 12.09 11.82
07/13 02:00 0.00 14.82 8586 12.08 11.82
07/13 03:00 0.00 14.80 8555 12.09 11.81
07/13 04:00 0.00 14.77 8508 12.08 11.81
07/13 05:00 0.00 14.77 8508 12.08 11.81
07/13 06:00 0.00 14.77 8508 12.08 11.81
07/13 07:00 0.00 14.75 8477 12.08 11.81
07/13 08:00 0.00 14.72 8431 12.08 11.81
07/13 09:00 0.00 14.71 8415 12.08 11.81
07/13 10:00 0.00 14.71 8415 12.08 11.81
07/13 11:00 0.00 14.68 8369 12.08 11.81
07/13 12:00 0.00 14.68 8369 12.08 11.80
07/13 13:00 0.00 14.67 8354 12.08 11.80
07/13 14:00 0.00 14.65 8323 12.09 11.81
07/13 15:00 0.00 14.65 8323 12.10 11.81
07/13 16:00 0.00 14.62 8277 12.08 11.81
07/13 17:00 0.00 14.61 8262 12.10 11.81
07/13 18:00 0.00 14.60 8247 12.08 11.81
07/13 19:00 0.00 14.61 8262 12.09 11.81
07/13 20:00 0.00 14.58 8216 12.10 11.81
07/13 21:00 0.00 14.59 8231 12.09 11.81
07/13 22:00 0.00 14.55 8171 12.09 11.81
07/13 23:00 0.00 14.54 8156 12.09 11.81
Data processed at Mon 14Jul2025 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.