CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/11 00:00 0.00 13.00 5751 12.82 12.45
05/11 01:00 0.00 13.00 5751 12.81 12.45
05/11 02:00 0.00 12.99 5736 12.80 12.44
05/11 03:00 0.00 12.99 5736 12.77 12.42
05/11 04:00 0.00 12.98 5721 12.75 12.40
05/11 05:00 0.00 12.97 5705 12.72 12.37
05/11 06:00 0.00 12.96 5690 12.70 12.34
05/11 07:00 0.00 12.96 5690 12.69 12.30
05/11 08:00 0.00 12.94 5660 12.74 12.33
05/11 09:00 0.00 12.94 5660 12.90 12.40
05/11 10:00 0.00 12.93 5645 13.03 12.57
05/11 11:00 0.00 12.92 5630 13.19 12.71
05/11 12:00 0.00 12.91 5615 13.45 12.93
05/11 13:00 0.00 12.90 5599 13.53 13.13
05/11 14:00 0.00 12.90 5599 13.57 13.09
05/11 15:00 0.00 12.89 5584 13.51 13.05
05/11 16:00 0.00 12.89 5584 13.78 12.97
05/11 17:00 0.00 12.88 5569 13.87 12.90
05/11 18:00 0.00 12.87 5554 13.61 12.90
05/11 19:00 0.00 12.88 5569 13.97 12.93
05/11 20:00 0.00 12.87 5554 13.13 12.87
05/11 21:00 0.00 12.87 5554 12.96 12.69
05/11 22:00 0.00 12.87 5554 12.90 12.57
05/11 23:00 0.00 12.86 5540 12.85 12.50
Data processed at Sun 12May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.