CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/12 00:00 0.00 12.86 5540 12.82 12.47
05/12 01:00 0.00 12.85 5525 12.81 12.46
05/12 02:00 0.00 12.85 5525 12.80 12.44
05/12 03:00 0.00 12.84 5510 12.80 12.44
05/12 04:00 0.00 12.83 5495 12.76 12.41
05/12 05:00 0.00 12.82 5480 12.75 12.40
05/12 06:00 0.00 12.81 5465 12.72 12.37
05/12 07:00 0.00 12.80 5450 12.72 12.35
05/12 08:00 0.00 12.80 5450 12.88 12.37
05/12 09:00 0.00 12.79 5436 13.19 12.67
05/12 10:00 0.00 12.78 5421 13.78 13.09
05/12 11:00 0.00 12.77 5406 13.50 13.16
05/12 12:00 0.00 12.76 5392 13.51 13.06
05/12 13:00 0.00 12.77 5406 13.78 12.99
05/12 14:00 0.00 12.76 5392 13.95 12.94
05/12 15:00 0.00 12.76 5392 13.51 12.92
05/12 16:00 0.00 12.75 5377 13.80 12.94
05/12 17:00 0.00 12.75 5377 13.64 12.88
05/12 18:00 0.00 12.74 5362 13.76 12.88
05/12 19:00 0.00 12.74 5362 13.68 12.90
05/12 20:00 0.00 12.73 5348 13.07 12.80
05/12 21:00 0.00 12.73 5348 12.95 12.62
05/12 22:00 0.00 12.74 5362 12.86 12.53
05/12 23:00 0.00 12.73 5348 12.84 12.48
Data processed at Mon 13May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.