CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/10 00:00 0.00 12.39 4833 12.82 12.48
05/10 01:00 0.00 12.43 4893 12.80 12.47
05/10 02:00 0.00 12.48 4968 12.78 12.42
05/10 03:00 0.00 12.53 5044 12.77 12.42
05/10 04:00 0.00 12.58 5121 12.74 12.37
05/10 05:00 0.00 12.64 5214 12.73 12.37
05/10 06:00 0.00 12.69 5290 12.70 12.34
05/10 07:00 0.00 12.75 5377 12.70 12.33
05/10 08:00 0.00 12.80 5450 12.73 12.34
05/10 09:00 0.00 12.84 5510 12.81 12.40
05/10 10:00 0.00 12.88 5569 12.92 12.46
05/10 11:00 0.00 12.91 5615 13.09 12.60
05/10 12:00 0.00 12.94 5660 13.45 12.86
05/10 13:00 0.00 12.97 5705 13.53 13.12
05/10 14:00 0.00 12.98 5721 13.55 13.13
05/10 15:00 0.00 13.00 5751 14.02 13.03
05/10 16:00 0.00 13.00 5751 13.51 12.99
05/10 17:00 0.00 13.01 5767 14.26 12.98
05/10 18:00 0.00 13.01 5767 13.99 12.93
05/10 19:00 0.00 13.02 5782 13.22 12.90
05/10 20:00 0.00 13.02 5782 13.03 12.78
05/10 21:00 0.00 13.02 5782 12.93 12.63
05/10 22:00 0.00 13.01 5767 12.86 12.53
05/10 23:00 0.00 13.01 5767 12.83 12.49
Data processed at Sat 11May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.