CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
05/09 00:00 0.00 11.49 3605 12.82 12.50
05/09 01:00 0.00 11.30 3371 12.80 12.49
05/09 02:00 0.00 11.13 3172 12.79 12.48
05/09 03:00 0.00 10.98 3002 12.77 12.46
05/09 04:00 0.00 10.85 2858 12.76 12.44
05/09 05:00 0.00 10.74 2741 12.73 12.40
05/09 06:00 0.00 10.65 2648 12.71 12.37
05/09 07:00 0.00 10.59 2588 12.70 12.33
05/09 08:00 0.00 10.58 2578 12.76 12.33
05/09 09:00 0.00 10.63 2628 12.92 12.43
05/09 10:00 0.00 10.75 2752 13.33 12.87
05/09 11:00 0.00 10.93 2946 13.42 12.95
05/09 12:00 0.00 11.13 3172 13.76 13.08
05/09 13:00 0.00 11.34 3419 13.51 13.10
05/09 14:00 0.00 11.54 3668 13.50 13.07
05/09 15:00 0.00 11.72 3903 14.02 13.05
05/09 16:00 0.00 11.86 4094 13.59 12.99
05/09 17:00 0.00 12.00 4281 13.63 12.94
05/09 18:00 0.00 12.11 4432 13.59 12.92
05/09 19:00 0.00 12.18 4530 13.17 12.88
05/09 20:00 0.00 12.24 4615 13.01 12.77
05/09 21:00 0.00 12.29 4687 12.91 12.63
05/09 22:00 0.00 12.33 4745 12.86 12.54
05/09 23:00 0.00 12.36 4789 12.83 12.50
Data processed at Fri 10May2024 04:37 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.