CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/12 00:00 0.00 12.75 5377 12.81 12.44
02/12 01:00 0.00 12.75 5377 12.80 12.42
02/12 02:00 0.00 12.75 5377 12.77 12.40
02/12 03:00 0.00 12.75 5377 12.75 12.38
02/12 04:00 0.00 12.74 5362 12.72 12.35
02/12 05:00 0.00 12.73 5348 12.70 12.32
02/12 06:00 0.00 12.72 5333 12.68 12.31
02/12 07:00 0.00 12.72 5333 12.67 12.30
02/12 08:00 0.00 12.72 5333 12.70 12.29
02/12 09:00 0.00 12.70 5304 12.86 12.37
02/12 10:00 0.00 12.70 5304 13.45 12.70
02/12 11:00 0.00 12.68 5275 13.64 13.16
02/12 12:00 0.00 12.67 5261 13.53 13.12
02/12 13:00 0.00 12.67 5261 13.72 13.08
02/12 14:00 0.00 12.66 5241 13.76 13.03
02/12 15:00 0.00 12.65 5220 13.58 13.00
02/12 16:00 0.00 12.65 5220 13.52 12.99
02/12 17:00 0.00 12.64 5200 13.82 12.96
02/12 18:00 0.00 12.63 5179 13.17 12.90
02/12 19:00 0.00 12.63 5179 13.02 12.71
02/12 20:00 0.00 12.62 5159 12.93 12.61
02/12 21:00 0.00 12.60 5119 12.88 12.54
02/12 22:00 0.00 12.57 5059 12.86 12.50
02/12 23:00 0.00 12.52 4960 12.84 12.48
Data processed at Tue 13Feb2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.