CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/11 00:00 0.00 12.94 4503 12.82 12.44
02/11 01:00 0.00 12.94 4503 12.80 12.43
02/11 02:00 0.00 12.93 4484 12.78 12.43
02/11 03:00 0.00 12.92 4465 12.76 12.40
02/11 04:00 0.00 12.90 4427 12.73 12.37
02/11 05:00 0.00 12.89 4408 12.72 12.36
02/11 06:00 0.00 12.87 4370 12.71 12.34
02/11 07:00 0.00 12.87 4370 12.70 12.33
02/11 08:00 0.00 12.86 4352 12.70 12.32
02/11 09:00 0.00 12.86 4352 12.85 12.36
02/11 10:00 0.00 12.85 4333 13.18 12.59
02/11 11:00 0.00 12.84 4315 14.01 13.01
02/11 12:00 0.00 12.84 4315 13.69 13.14
02/11 13:00 0.00 12.83 4296 13.55 13.08
02/11 14:00 0.00 12.82 4278 14.08 13.05
02/11 15:00 0.00 12.82 4278 14.30 13.03
02/11 16:00 0.00 12.82 4278 13.89 13.01
02/11 17:00 0.00 12.81 4259 14.34 12.97
02/11 18:00 0.00 12.80 4241 13.22 12.95
02/11 19:00 0.00 12.80 4241 13.05 12.73
02/11 20:00 0.00 12.79 4223 12.95 12.63
02/11 21:00 0.00 12.78 4205 12.90 12.54
02/11 22:00 0.00 12.78 4205 12.86 12.49
02/11 23:00 0.00 12.77 4187 12.83 12.46
Data processed at Mon 12Feb2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.