CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/10 00:00 0.00 14.24 7626 12.83 12.46
02/10 01:00 0.00 14.21 7538 12.82 12.45
02/10 02:00 0.00 14.17 7422 12.80 12.44
02/10 03:00 0.00 14.11 7251 12.79 12.44
02/10 04:00 0.00 14.04 7055 12.77 12.42
02/10 05:00 0.00 13.96 6837 12.75 12.40
02/10 06:00 0.00 13.87 6597 12.73 12.36
02/10 07:00 0.00 13.76 6315 12.72 12.35
02/10 08:00 0.00 13.66 6066 12.76 12.34
02/10 09:00 0.00 13.56 5826 13.03 12.48
02/10 10:00 0.00 13.48 5639 13.78 12.90
02/10 11:00 0.00 13.40 5457 13.69 13.09
02/10 12:00 0.00 13.33 5302 13.54 13.06
02/10 13:00 0.00 13.27 5172 13.73 13.02
02/10 14:00 0.00 13.21 5045 13.52 13.05
02/10 15:00 0.00 13.16 4941 14.06 12.97
02/10 16:00 0.00 13.12 4858 14.27 12.98
02/10 17:00 0.00 13.09 4798 14.18 12.99
02/10 18:00 0.00 13.06 4737 13.16 12.90
02/10 19:00 0.00 13.03 4678 13.03 12.71
02/10 20:00 0.00 13.00 4619 12.93 12.60
02/10 21:00 0.00 12.99 4599 12.88 12.53
02/10 22:00 0.00 12.97 4561 12.86 12.50
02/10 23:00 0.00 12.96 4541 12.83 12.47
Data processed at Sun 11Feb2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.