CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/13 00:00 0.00 12.45 4825 12.82 12.45
02/13 01:00 0.00 12.35 4636 12.80 12.43
02/13 02:00 0.00 12.26 4471 12.77 12.41
02/13 03:00 0.00 12.13 4242 12.76 12.38
02/13 04:00 0.00 12.00 4022 12.73 12.37
02/13 05:00 0.00 11.85 3766 12.71 12.34
02/13 06:00 0.00 11.71 3471 12.68 12.31
02/13 07:00 0.00 11.58 3216 12.67 12.30
02/13 08:00 0.00 11.44 2958 12.68 12.30
02/13 09:00 0.00 11.30 2719 12.76 12.36
02/13 10:00 0.00 11.18 2527 13.42 12.70
02/13 11:00 0.00 11.04 2338 13.70 13.17
02/13 12:00 0.00 10.95 2260 13.55 13.13
02/13 13:00 0.00 10.86 2185 13.69 13.10
02/13 14:00 0.00 10.75 2095 13.74 13.05
02/13 15:00 0.00 10.71 2064 13.53 13.00
02/13 16:00 0.00 10.65 2016 13.51 12.96
02/13 17:00 0.00 10.60 1978 13.57 12.96
02/13 18:00 0.00 10.57 1955 13.16 12.90
02/13 19:00 0.00 10.53 1925 13.01 12.70
02/13 20:00 0.00 10.50 1902 12.93 12.59
02/13 21:00 0.00 10.48 1887 12.90 12.54
02/13 22:00 0.00 10.45 1865 12.86 12.49
02/13 23:00 0.00 10.43 1850 12.85 12.48
Data processed at Wed 14Feb2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.