CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/07 00:00 0.00 14.95 7781 12.83 12.48
02/07 01:00 0.00 14.95 7781 12.82 12.46
02/07 02:00 0.00 14.95 7781 12.80 12.45
02/07 03:00 0.00 14.95 7781 12.77 12.43
02/07 04:00 0.00 14.93 7737 12.77 12.40
02/07 05:00 0.00 14.93 7737 12.74 12.39
02/07 06:00 0.00 14.90 7672 12.73 12.36
02/07 07:00 0.00 14.90 7672 12.71 12.35
02/07 08:00 0.00 14.90 7672 12.73 12.34
02/07 09:00 0.00 14.88 7629 12.98 12.46
02/07 10:00 0.00 14.88 7629 13.53 12.98
02/07 11:00 0.00 14.85 7565 13.90 13.09
02/07 12:00 0.00 14.83 7522 14.01 13.05
02/07 13:00 0.00 14.83 7522 14.11 13.03
02/07 14:00 0.00 14.82 7501 13.72 12.99
02/07 15:00 0.00 14.81 7480 13.78 12.99
02/07 16:00 0.00 14.80 7458 14.24 12.99
02/07 17:00 0.00 14.79 7437 13.34 12.98
02/07 18:00 0.00 14.78 7416 13.09 12.80
02/07 19:00 0.00 14.76 7374 12.96 12.65
02/07 20:00 0.00 14.75 7353 12.91 12.58
02/07 21:00 0.00 14.74 7332 12.90 12.54
02/07 22:00 0.00 14.73 7312 12.87 12.53
02/07 23:00 0.00 14.72 7291 12.86 12.50
Data processed at Fri 09Feb2024 03:19 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.