CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/08 00:00 0.00 14.71 7270 12.85 12.50
02/08 01:00 0.00 14.71 7270 12.84 12.48
02/08 02:00 0.00 14.70 7249 12.83 12.47
02/08 03:00 0.00 14.69 7229 12.82 12.46
02/08 04:00 0.00 14.68 7208 12.80 12.45
02/08 05:00 0.00 14.66 7167 12.79 12.44
02/08 06:00 0.00 14.65 7146 12.78 12.42
02/08 07:00 0.00 14.64 7126 12.77 12.41
02/08 08:00 0.00 14.63 7106 12.77 12.40
02/08 09:00 0.00 14.61 7065 12.84 12.42
02/08 10:00 0.00 14.59 7024 13.28 12.70
02/08 11:00 0.00 14.57 6984 14.04 13.06
02/08 12:00 0.00 14.56 6964 13.52 13.03
02/08 13:00 0.00 14.55 6944 13.94 13.03
02/08 14:00 0.00 14.56 6964 13.51 13.01
02/08 15:00 0.00 14.55 6944 13.93 13.00
02/08 16:00 0.00 14.52 6884 13.52 13.00
02/08 17:00 0.00 14.55 6944 13.97 12.99
02/08 18:00 0.00 14.54 6924 13.13 12.90
02/08 19:00 0.00 14.53 6904 12.99 12.69
02/08 20:00 0.00 14.52 6884 12.93 12.61
02/08 21:00 0.00 14.51 6864 12.89 12.57
02/08 22:00 0.00 14.50 6844 12.87 12.54
02/08 23:00 0.00 14.50 6844 12.86 12.53
Data processed at Fri 09Feb2024 05:39 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.