CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/06 00:00 0.00 13.04 4385 12.84 12.48
02/06 01:00 0.00 12.91 4205 12.83 12.47
02/06 02:00 0.00 12.83 4097 12.80 12.44
02/06 03:00 0.00 12.78 4030 12.80 12.42
02/06 04:00 0.00 12.78 4030 12.77 12.42
02/06 05:00 0.00 12.83 4097 12.76 12.40
02/06 06:00 0.00 12.94 4246 12.73 12.40
02/06 07:00 0.00 13.08 4442 12.73 12.37
02/06 08:00 0.00 13.27 4719 12.73 12.34
02/06 09:00 0.00 13.46 5009 12.85 12.40
02/06 10:00 0.00 13.65 5312 13.51 12.73
02/06 11:00 0.00 13.84 5630 13.55 13.16
02/06 12:00 0.00 14.02 5943 13.59 13.13
02/06 13:00 0.00 14.20 6270 13.60 13.08
02/06 14:00 0.00 14.35 6552 13.79 13.05
02/06 15:00 0.00 14.48 6805 14.15 13.01
02/06 16:00 0.00 14.59 7024 14.04 13.00
02/06 17:00 0.00 14.68 7208 13.36 12.99
02/06 18:00 0.00 14.75 7353 13.09 12.80
02/06 19:00 0.00 14.82 7501 12.96 12.66
02/06 20:00 0.00 14.86 7586 12.92 12.59
02/06 21:00 0.00 14.89 7650 12.88 12.54
02/06 22:00 0.00 14.92 7715 12.87 12.52
02/06 23:00 0.00 14.94 7759 12.85 12.50
Data processed at Fri 09Feb2024 03:19 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.