CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/31 00:00 0.00 13.55 5151 12.85 12.53
01/31 01:00 0.00 13.54 5135 12.83 12.50
01/31 02:00 0.00 13.54 5135 12.82 12.49
01/31 03:00 0.00 13.54 5135 12.80 12.47
01/31 04:00 0.00 13.53 5119 12.80 12.46
01/31 05:00 0.00 13.53 5119 12.79 12.44
01/31 06:00 0.00 13.52 5103 12.77 12.44
01/31 07:00 0.00 13.52 5103 12.76 12.41
01/31 08:00 0.00 13.51 5088 12.76 12.40
01/31 09:00 0.00 13.50 5072 12.84 12.44
01/31 10:00 0.00 13.50 5072 13.38 12.76
01/31 11:00 0.00 13.49 5056 14.01 13.03
01/31 12:00 0.00 13.48 5040 13.53 13.07
01/31 13:00 0.00 13.48 5040 13.53 13.06
01/31 14:00 0.00 13.48 5040 14.03 13.05
01/31 15:00 0.00 13.46 5009 13.55 13.03
01/31 16:00 0.00 13.45 4993 13.64 13.03
01/31 17:00 0.00 13.46 5009 13.49 13.01
01/31 18:00 0.00 13.45 4993 13.11 12.86
01/31 19:00 0.00 13.45 4993 12.99 12.69
01/31 20:00 0.00 13.44 4978 12.93 12.62
01/31 21:00 0.00 13.43 4962 12.90 12.58
01/31 22:00 0.00 13.42 4947 12.88 12.55
01/31 23:00 0.00 13.38 4885 12.86 12.53
Data processed at Fri 09Feb2024 03:19 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.