CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
02/01 00:00 0.00 13.33 4809 12.86 12.53
02/01 01:00 0.00 13.27 4719 12.84 12.50
02/01 02:00 0.00 13.19 4601 12.83 12.50
02/01 03:00 0.00 13.08 4442 12.82 12.48
02/01 04:00 0.00 12.97 4287 12.80 12.47
02/01 05:00 0.00 12.84 4110 12.80 12.46
02/01 06:00 0.00 12.70 3925 12.77 12.45
02/01 07:00 0.00 12.55 3735 12.77 12.44
02/01 08:00 0.00 12.38 3527 12.79 12.42
02/01 09:00 0.00 12.20 3346 13.01 12.54
02/01 10:00 0.00 12.03 3182 13.57 12.80
02/01 11:00 0.00 11.84 3007 13.73 13.05
02/01 12:00 0.00 11.65 2838 14.08 13.05
02/01 13:00 0.00 11.46 2676 14.20 13.03
02/01 14:00 0.00 11.28 2529 13.55 13.06
02/01 15:00 0.00 11.10 2388 14.31 13.03
02/01 16:00 0.00 10.93 2244 14.18 13.03
02/01 17:00 0.00 10.78 2120 13.23 12.96
02/01 18:00 0.00 10.63 2001 13.05 12.77
02/01 19:00 0.00 10.49 1895 12.96 12.65
02/01 20:00 0.00 10.36 1800 12.92 12.60
02/01 21:00 0.00 10.25 1723 12.90 12.57
02/01 22:00 0.00 10.15 1654 12.88 12.55
02/01 23:00 0.00 10.06 1595 12.86 12.54
Data processed at Fri 09Feb2024 03:19 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.