CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/30 00:00 0.00 12.96 4274 12.86 12.55
01/30 01:00 0.00 12.99 4315 12.85 12.53
01/30 02:00 0.00 13.03 4371 12.83 12.52
01/30 03:00 0.00 13.07 4428 12.82 12.50
01/30 04:00 0.00 13.11 4485 12.80 12.50
01/30 05:00 0.00 13.17 4572 12.80 12.47
01/30 06:00 0.00 13.22 4645 12.79 12.47
01/30 07:00 0.00 13.26 4704 12.77 12.45
01/30 08:00 0.00 13.31 4779 12.77 12.44
01/30 09:00 0.00 13.35 4840 12.83 12.45
01/30 10:00 0.00 13.39 4901 13.30 12.76
01/30 11:00 0.00 13.42 4947 13.53 13.02
01/30 12:00 0.00 13.45 4993 13.84 13.09
01/30 13:00 0.00 13.47 5025 13.52 13.09
01/30 14:00 0.00 13.49 5056 13.51 13.07
01/30 15:00 0.00 13.51 5088 13.55 13.06
01/30 16:00 0.00 13.52 5103 13.96 13.07
01/30 17:00 0.00 13.53 5119 13.36 13.05
01/30 18:00 0.00 13.54 5135 13.09 12.86
01/30 19:00 0.00 13.54 5135 12.98 12.70
01/30 20:00 0.00 13.55 5151 12.93 12.63
01/30 21:00 0.00 13.55 5151 12.90 12.59
01/30 22:00 0.00 13.55 5151 12.89 12.57
01/30 23:00 0.00 13.54 5135 12.87 12.54
Data processed at Fri 09Feb2024 03:19 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.