CNUK1: Grand River, Chanute

                                SHEF ID:       CNUK1     NEOSHO R NR CHANUTE, KS
STATION TYPE:
Regulating: Stage = 22.00, Flow = 20159

PRECIP STAGE RIV-FLOW VOLTAGE BAT-LOAD
in ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/29 00:00 0.00 13.08 4442 12.85 12.53
01/29 01:00 0.00 13.07 4428 12.83 12.52
01/29 02:00 0.00 13.05 4400 12.82 12.50
01/29 03:00 0.00 13.04 4385 12.81 12.49
01/29 04:00 0.00 13.02 4357 12.79 12.47
01/29 05:00 0.00 13.02 4357 12.79 12.45
01/29 06:00 0.00 13.01 4343 12.77 12.44
01/29 07:00 0.00 13.00 4329 12.76 12.42
01/29 08:00 0.00 12.99 4315 12.74 12.40
01/29 09:00 0.00 12.98 4301 12.83 12.43
01/29 10:00 0.00 12.98 4301 13.26 12.73
01/29 11:00 0.00 12.97 4287 13.99 13.03
01/29 12:00 0.00 12.97 4287 13.67 13.13
01/29 13:00 0.00 12.96 4274 13.52 13.12
01/29 14:00 0.00 12.95 4260 13.70 13.09
01/29 15:00 0.00 12.94 4246 13.62 13.09
01/29 16:00 0.00 12.95 4260 13.65 13.09
01/29 17:00 0.00 12.93 4232 13.34 13.07
01/29 18:00 0.00 12.93 4232 13.06 12.81
01/29 19:00 0.00 12.93 4232 12.98 12.69
01/29 20:00 0.00 12.93 4232 12.94 12.64
01/29 21:00 0.00 12.92 4219 12.91 12.61
01/29 22:00 0.00 12.93 4232 12.90 12.59
01/29 23:00 0.00 12.94 4246 12.87 12.57
Data processed at Fri 09Feb2024 03:19 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
CHAU.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
CHAU.Stage.Inst.1Hour.0.Ccp-Rev
CHAU.Flow.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery.Inst.1Hour.0.Ccp-Rev
CHAU.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.