Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/10 00:00 0.00 391.66 371.66 13.20 09/10 01:00 0.00 391.50 371.66 13.10 09/10 02:00 0.00 391.60 371.55 13.10 09/10 03:00 0.00 391.66 371.58 13.80 09/10 04:00 0.00 391.55 371.74 13.70 09/10 05:00 0.00 391.55 371.66 13.20 09/10 06:00 0.00 391.61 371.27 13.20 09/10 07:00 0.00 391.57 371.60 13.40 09/10 08:00 0.00 391.54 371.60 13.20 09/10 09:00 0.00 391.57 371.70 13.10 09/10 10:00 0.00 391.62 371.74 13.20 09/10 11:00 0.00 391.61 371.61 13.50 09/10 12:00 0.00 391.55 371.59 13.30 09/10 13:00 0.00 391.60 371.64 13.40 09/10 14:00 0.00 391.63 371.70 13.70 09/10 15:00 0.00 391.56 371.70 13.60 09/10 16:00 0.00 391.35 372.24 13.20 09/10 17:00 0.00 391.63 372.10 13.60 09/10 18:00 0.00 392.14 371.50 13.60 09/10 19:00 0.00 391.96 371.28 13.10 09/10 20:00 0.00 391.75 371.89 13.20 09/10 21:00 0.00 391.84 372.06 13.00 09/10 22:00 0.09 391.89 372.20 13.00 09/10 23:00 0.00 391.77 372.09 13.00