Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/09 00:00 0.00 391.42 371.74 13.60 09/09 01:00 0.00 391.66 371.91 13.00 09/09 02:00 0.00 391.46 371.57 13.00 09/09 03:00 0.00 391.43 371.32 13.00 09/09 04:00 0.00 391.52 371.62 13.50 09/09 05:00 0.00 391.55 371.74 13.00 09/09 06:00 0.00 391.43 371.66 13.40 09/09 07:00 0.00 391.47 371.54 13.60 09/09 08:00 0.00 391.54 371.43 13.20 09/09 09:00 0.00 391.48 371.59 13.00 09/09 10:00 0.00 391.47 371.07 13.10 09/09 11:00 0.00 391.50 371.63 13.00 09/09 12:00 0.00 391.51 371.46 13.10 09/09 13:00 0.00 391.46 371.56 13.00 09/09 14:00 0.00 391.48 372.26 13.10 09/09 15:00 0.00 391.58 372.59 13.50 09/09 16:00 0.00 391.62 372.62 13.00 09/09 17:00 0.00 391.60 372.48 13.00 09/09 18:00 0.00 391.61 372.18 13.00 09/09 19:00 0.00 391.91 371.31 13.20 09/09 20:00 0.00 391.93 371.76 13.30 09/09 21:00 0.00 391.49 371.57 13.20 09/09 22:00 0.00 391.53 371.48 13.20 09/09 23:00 0.00 391.69 371.74 13.10