Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/11 00:00 0.00 391.68 371.69 13.30 09/11 01:00 0.00 391.66 371.55 13.10 09/11 02:00 0.00 391.66 372.15 13.40 09/11 03:00 0.00 391.69 371.99 13.40 09/11 04:00 0.00 391.67 372.07 13.20 09/11 05:00 0.00 391.66 371.57 13.10 09/11 06:00 0.00 391.68 371.62 13.20 09/11 07:00 0.00 391.69 371.81 13.00 09/11 08:00 0.00 391.66 371.99 13.40 09/11 09:00 0.00 391.68 371.88 13.10 09/11 10:00 0.00 391.69 371.69 13.30 09/11 11:00 0.00 391.66 371.66 13.00 09/11 12:00 0.00 391.64 371.60 12.90 09/11 13:00 0.00 391.67 371.97 13.10 09/11 14:00 0.00 391.65 371.83 13.60 09/11 15:00 0.00 391.48 372.09 13.10 09/11 16:00 0.00 391.59 371.91 13.40 09/11 17:00 0.00 391.68 372.42 13.00 09/11 18:00 0.00 391.75 372.44 13.70 09/11 19:00 0.00 391.96 371.72 13.30 09/11 20:00 0.00 391.82 371.97 13.00 09/11 21:00 0.00 391.53 372.06 13.00 09/11 22:00 0.00 391.59 372.25 13.60 09/11 23:00 0.00 391.77 372.43 13.10