Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/16 00:00 0.00 391.57 371.67 13.50 08/16 01:00 0.00 391.82 371.54 13.50 08/16 02:00 0.00 391.78 371.38 13.60 08/16 03:00 0.00 391.60 371.26 13.10 08/16 04:00 0.00 391.68 371.45 13.10 08/16 05:00 0.00 391.77 371.61 13.70 08/16 06:00 0.00 391.69 371.49 13.20 08/16 07:00 0.00 391.49 371.31 13.10 08/16 08:00 0.00 391.73 371.22 13.40 08/16 09:00 0.00 391.61 371.70 13.70 08/16 10:00 0.00 391.48 371.99 13.10 08/16 11:00 0.00 391.56 372.02 13.20 08/16 12:00 0.00 391.71 372.13 13.40 08/16 13:00 0.00 391.70 372.15 13.20 08/16 14:00 0.00 391.72 372.22 13.20 08/16 15:00 0.00 391.74 372.40 13.00 08/16 16:00 0.00 391.76 372.29 13.00 08/16 17:00 0.00 391.73 371.99 13.00 08/16 18:00 0.00 391.76 371.76 12.90 08/16 19:00 0.00 391.77 371.57 13.00 08/16 20:00 0.00 391.73 371.57 13.20 08/16 21:00 0.00 391.91 371.48 13.00 08/16 22:00 0.00 391.84 371.06 13.00 08/16 23:00 0.00 391.48 371.34 13.20