Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/17 00:00 0.00 391.50 371.41 13.40 08/17 01:00 0.01 391.76 371.54 13.60 08/17 02:00 0.00 391.60 371.62 13.20 08/17 03:00 0.00 391.50 371.41 13.50 08/17 04:00 0.00 391.63 371.62 13.20 08/17 05:00 0.04 391.66 371.52 13.10 08/17 06:00 0.09 391.61 371.43 12.90 08/17 07:00 0.44 391.58 371.55 13.30 08/17 08:00 0.33 391.74 371.50 13.50 08/17 09:00 0.04 391.74 371.55 13.30 08/17 10:00 0.00 391.68 371.58 13.50 08/17 11:00 0.00 391.71 371.52 13.50 08/17 12:00 0.00 391.76 371.60 13.10 08/17 13:00 0.00 391.68 372.36 13.00 08/17 14:00 0.00 391.93 372.62 12.90 08/17 15:00 0.00 391.84 372.67 13.60 08/17 16:00 0.01 391.77 372.59 13.00 08/17 17:00 0.00 391.70 372.36 13.10 08/17 18:00 0.00 391.64 372.18 13.40 08/17 19:00 0.00 391.58 372.13 12.90 08/17 20:00 0.00 391.50 372.15 13.10 08/17 21:00 0.00 391.57 372.03 13.20 08/17 22:00 0.00 391.55 372.01 13.20 08/17 23:00 0.00 391.83 371.37 13.20