Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/15 00:00 0.00 391.46 371.92 13.60 08/15 01:00 0.00 391.69 371.91 13.70 08/15 02:00 0.00 391.78 366.76 13.10 08/15 03:00 0.00 391.64 371.58 13.20 08/15 04:00 0.00 391.58 371.53 13.00 08/15 05:00 0.00 391.72 371.34 13.10 08/15 06:00 0.00 391.68 371.70 13.20 08/15 07:00 0.00 391.53 371.67 13.70 08/15 08:00 0.00 391.46 371.88 13.80 08/15 09:00 0.00 391.68 372.00 13.10 08/15 10:00 0.00 391.52 372.45 13.50 08/15 11:00 0.00 391.39 372.62 13.30 08/15 12:00 0.00 391.61 372.56 13.60 08/15 13:00 0.00 391.59 372.67 13.40 08/15 14:00 0.00 391.54 372.77 13.60 08/15 15:00 0.00 391.56 372.90 13.30 08/15 16:00 0.00 391.55 372.87 13.60 08/15 17:00 0.00 391.59 372.35 13.40 08/15 18:00 0.00 391.58 372.12 13.10 08/15 19:00 0.00 391.62 371.90 13.60 08/15 20:00 0.00 391.63 371.71 13.50 08/15 21:00 0.00 391.84 370.85 13.30 08/15 22:00 0.00 392.02 371.03 13.00 08/15 23:00 0.00 391.57 371.29 13.30