Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/14 00:00 0.00 391.90 370.97 13.00 08/14 01:00 0.00 391.62 371.08 13.10 08/14 02:00 0.00 391.69 371.36 13.80 08/14 03:00 0.00 391.82 371.40 13.10 08/14 04:00 0.00 391.73 371.45 13.60 08/14 05:00 0.00 391.66 371.13 13.20 08/14 06:00 0.00 391.76 371.10 13.10 08/14 07:00 0.00 391.75 371.47 13.40 08/14 08:00 0.00 391.39 372.13 13.80 08/14 09:00 0.00 391.74 372.10 13.30 08/14 10:00 0.00 391.80 372.23 13.30 08/14 11:00 0.00 391.78 372.15 13.30 08/14 12:00 0.00 391.76 372.28 13.20 08/14 13:00 0.00 391.79 372.50 13.70 08/14 14:00 0.00 391.80 372.62 13.40 08/14 15:00 0.00 391.78 372.72 13.10 08/14 16:00 0.00 391.76 372.51 13.20 08/14 17:00 0.00 391.76 372.39 13.10 08/14 18:00 0.00 391.75 372.27 13.20 08/14 19:00 0.00 391.71 372.52 13.60 08/14 20:00 0.00 391.69 372.46 13.00 08/14 21:00 0.00 391.66 372.37 13.00 08/14 22:00 0.00 391.99 371.40 13.00 08/14 23:00 0.00 391.84 370.43 13.20