Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/13 00:00 0.00 392.02 371.25 13.20 08/13 01:00 0.00 391.54 371.25 13.20 08/13 02:00 0.00 391.60 371.61 13.50 08/13 03:00 0.00 391.80 371.74 13.30 08/13 04:00 0.00 391.72 371.61 13.00 08/13 05:00 0.00 391.58 371.35 13.00 08/13 06:00 0.00 391.69 371.46 13.10 08/13 07:00 0.00 391.77 371.66 13.50 08/13 08:00 0.00 391.65 371.65 13.40 08/13 09:00 0.00 391.39 372.10 13.30 08/13 10:00 0.00 391.71 372.16 13.00 08/13 11:00 0.00 391.80 372.24 13.60 08/13 12:00 0.00 391.73 372.35 13.00 08/13 13:00 0.00 391.71 372.30 13.50 08/13 14:00 0.00 391.79 372.55 13.60 08/13 15:00 0.00 391.80 372.71 13.60 08/13 16:00 0.00 391.80 372.34 13.40 08/13 17:00 0.00 391.80 372.01 13.60 08/13 18:00 0.00 391.82 371.85 13.60 08/13 19:00 0.00 391.80 371.24 13.10 08/13 20:00 0.00 391.84 371.34 13.10 08/13 21:00 0.00 391.83 371.09 13.20 08/13 22:00 0.00 391.70 371.42 13.00 08/13 23:00 0.00 391.91 371.79 13.10