Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/23 00:00 0.00 391.46 371.30 12.70 11/23 01:00 0.00 391.48 371.46 13.40 11/23 02:00 0.00 391.48 371.55 12.60 11/23 03:00 0.00 391.43 371.48 12.60 11/23 04:00 0.00 391.37 371.46 13.40 11/23 05:00 0.00 391.53 366.31 13.30 11/23 06:00 0.00 391.39 371.10 12.90 11/23 07:00 0.00 391.27 371.26 13.30 11/23 08:00 0.00 391.34 371.21 13.10 11/23 09:00 0.00 391.72 371.17 12.60 11/23 10:00 0.00 391.74 370.89 12.60 11/23 11:00 0.00 391.48 370.71 12.60 11/23 12:00 0.00 391.50 370.82 12.60 11/23 13:00 0.00 391.71 371.09 12.60 11/23 14:00 0.00 391.64 371.08 13.00 11/23 15:00 0.00 391.52 370.91 12.90 11/23 16:00 0.00 391.61 370.87 12.60 11/23 17:00 0.00 391.67 370.92 13.10 11/23 18:00 0.00 391.58 371.00 12.70 11/23 19:00 0.00 391.55 371.01 12.50 11/23 20:00 0.00 391.78 371.28 12.90 11/23 21:00 0.00 391.84 371.43 12.50 11/23 22:00 0.00 391.79 371.47 13.10 11/23 23:00 0.00 391.78 371.39 13.20