Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/22 00:00 0.00 391.85 372.21 13.30 11/22 01:00 0.00 391.83 372.36 13.30 11/22 02:00 0.00 391.84 372.41 13.30 11/22 03:00 0.00 391.82 372.46 13.30 11/22 04:00 0.00 391.79 372.63 13.40 11/22 05:00 0.00 391.78 372.68 13.20 11/22 06:00 0.00 391.74 372.74 13.60 11/22 07:00 0.00 391.70 372.88 13.20 11/22 08:00 0.00 391.68 372.96 13.90 11/22 09:00 0.00 391.53 372.89 13.30 11/22 10:00 0.00 391.51 372.03 13.40 11/22 11:00 0.00 391.48 372.17 13.20 11/22 12:00 0.00 391.47 372.10 13.10 11/22 13:00 0.00 391.43 372.09 13.70 11/22 14:00 0.00 391.41 372.03 13.20 11/22 15:00 0.00 391.43 371.86 13.00 11/22 16:00 0.00 391.26 371.73 13.30 11/22 17:00 0.00 391.15 371.28 13.30 11/22 18:00 0.00 391.21 371.09 12.90 11/22 19:00 0.00 391.39 371.04 12.90 11/22 20:00 0.00 391.35 371.65 13.60 11/22 21:00 0.00 391.56 371.75 13.10 11/22 22:00 0.00 391.61 371.43 12.70 11/22 23:00 0.00 391.62 371.30 12.70