Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/24 00:00 0.00 391.84 370.61 12.70 11/24 01:00 0.00 391.82 371.47 13.20 11/24 02:00 0.00 391.79 371.69 12.60 11/24 03:00 0.00 391.83 371.76 13.20 11/24 04:00 0.00 391.82 371.78 13.00 11/24 05:00 0.00 391.82 371.89 12.70 11/24 06:00 0.00 391.81 371.99 12.90 11/24 07:00 0.00 391.81 372.09 13.00 11/24 08:00 0.00 391.83 372.15 12.70 11/24 09:00 0.00 391.82 372.05 13.10 11/24 10:00 0.00 391.85 371.99 13.20 11/24 11:00 0.00 391.80 372.01 12.70 11/24 12:00 0.00 391.65 371.72 13.20 11/24 13:00 0.00 391.53 371.74 12.60 11/24 14:00 0.00 391.53 371.99 12.70 11/24 15:00 0.00 391.57 371.68 12.80 11/24 16:00 0.00 391.67 372.02 12.80 11/24 17:00 0.00 391.59 371.87 13.30 11/24 18:00 0.00 391.57 371.81 13.40 11/24 19:00 0.00 391.61 371.86 13.00 11/24 20:00 0.00 391.61 371.92 13.20 11/24 21:00 0.00 391.60 371.89 12.90 11/24 22:00 0.00 391.70 371.83 12.70 11/24 23:00 0.00 391.68 372.02 13.20